| BMD Constructions (for Brisbane City Council, QUU) |
Woolloongabba Sewer Augmentation - Stage 2 & 3, Part A, Woollongabba, QLD |
144m of DN1000, 177m of DN700 & 775m of DN500 VC product pipe (Multiple Bores), including 2 off 4m diam., 2 off 5m diam. & one 6m diam deep steel segmental retrievable shafts |
Microtunneling, Pipe Jacking & shaft sinking |
Current |
| Christopher Contracting (for Watpac & Brisbane City Council) |
KBRB External Sewer Upgrade - Stage 1, Annerley, QLD |
440m of 800mm & 120m of 610mm MS casing (Multiple Bores) |
Microtunneling |
Jun-10 |
| Origin Alliance |
Upgrade of Ipswich Motorway, Dinmore to Goodna, QLD |
371m of 406mm, 643m of 457mm, 265m of 508mm, 207m of 610mm, 183m of 900mm & 60m of 1500mm - Trenchless sewer & water upgrade (multiple Bores) |
Microtunneling & Pipe Jacking |
Feb-10 |
| Setlow Constructions |
Thiess John Holland Airport Link Project, Kedron, QLD |
30m of 1650mm ID Sewer relocation includinig 12m deep, 6m diameter steel segmental lined shaft |
Pipe Jacking & Shaft Sinking |
Dec-09 |
| Georgiou Group |
Kewdale Freight Terminal Upgrade, Perth WA |
264m of 1500mm ID Stormwater installation under railways in 9 separate locations |
Pipe Jacking |
Oct-09 |
| Trackstar Alliance (Thiess United Group JV) |
QLD Northern Railway Line Upgrade - Beerwah Level Crossing, QLD |
2 x 21m of 2100mm ID RCJ Pipe Stormwater installation |
Pipe Jacking |
Oct-09 |
| Eastern Pipeline Alliance (AJ Lucas Transfield) |
Western Corridor, Brisbane QLD |
Hire out tunnel boring equipment & operator to assist with 6 x 24m of 1360mm steel casing |
Pipe Jacking |
Oct-08 |
| Department of Main Roads QLD |
Gateway Arterial Road, QLD |
Replacement of 198 m of 1950mm, 1800mm, and 1650mm CSP pipes with 2 x 2100mm and 1 x 1950mm RCP pipes |
Pipe Jacking |
Oct-08 |
| RTA NSW |
Replacement of Stormwater Culvert under F3 Freeway near Somersby, NSW |
89m of 1500mm ID RCJP J-Series - Stormwater Culvert |
Pipe Jacking |
Jul-08 |
| Glendusk (for Pine Rivers Shire Council) |
Bells Pocket Rd. Drainage Upgrade, QLD |
194m of 1350mm ID RCJP (two bores: 154m & 30m) |
Pipe Jacking |
Jul-08 |
| Abergeldie Infrastructure (for Energy Australia) |
New Cable Tunnel Carlton, NSW |
120m of 2400mm ID RCJP in rock - Cable Tunnel |
Pipe Jacking |
Jul-08 |
| Leighton BMD JV |
Safelink - Upgrade of Ipswich Mwy & Centenary Hwy, QLD |
1 x 65m of 1800mm ID RCJP, 3 x 57m of 2100mm ID RCJP - Stormwater |
Pipe Jacking |
Jul-08 |
| MCConnel Dowell Abigroup JV |
Western Pipeline Alliance, QLD |
249m x 1800mm ID and 118m x 1500mm ID RCJPs For Water Reuse Lines (10 tunnels alltogether) |
Pipe Jacking |
Nov-07 |
| Maryborough City Council |
Stormwater Drainage Upgrade, Maryborough QLD |
240m of 1950mm ID RCJP |
Pipe Jacking |
Apr-07 |
| Maryborough City Council |
Stormwater Drainage Upgrade, Maryborough QLD |
249m of 1950mm ID RCJP |
Pipe Jacking |
Dec-06 |
| Abergeldie Infrastructure (for Energy Australia) |
New Electrical Feed Cable Tunnels Artarmon & Pymble, NSW |
75m of 1650mm ID & 111m of 1500mm ID RCJP in rock - Cable Tunnels |
Pipe Jacking |
Jun-05 |
| Brisbane City Council |
Drainage Upgrade, Brisbane QLD |
2 x 102.5m of 1800mm ID RCJP |
Pipe Jacking |
Aug-04 |