| AN INTRODUCTION TO TUNNEL BORING AUSTRALIA A
1977 contract to jack 23m of 1800mm diameter concrete stormwater
pipe under a Brisbane railway began our specialisation.
For 20 years our key staff have been accumulating a wide knowledge
base of practical experience. This information is critical when
proposing practical solutions for our tunnelling work. The dedication
and experience of our staff put Tunnel Boring Australia ahead for
accuracy and success.
The principal methods utilised by Tunnel Boring Australia for the
installation of underground services are pipe jacking, laser guided
microtunnelling, and cased auger boring. At Tunnel Boring Australia,
it is our policy to develop new techniques and to continually improve
existing equipment. Tunnel Boring Australia's workshop offers the
facility to design and manufacture specific equipment to solve particular
construction problems.
The technology used in our operations is the very latest available
and our commitment to the continuous improvement of our services
has positioned Tunnel Boring Australia Pty Ltd at the forefront
of our industry. This commitment is reinforced through the development
and implementation of our Safety, Quality and Environmental Management
System, which is certified to ISO 9001, and also complies with the
latest standard, ISO 9000:2000.
Qualified Engineering staff are available for technical consultation,
as well as complete design and construct facility for micro-tunnelling
projects.
|